Federal Government Calms Fear On Third Mainland Bridge Collapse

"This is an old video. The bridge is not designed to be static. Expansion joints are not structural elements. We are very mindful of public safety" Kuti Reveals

Federal Government Calms Fear On Third Mainland Bridge Collapse
Third Mainland Bridge

The Federal Government has calm the fears of residents and motorists on the stability of the Third Mainland Bridge in Lagos, saying that it is strong and safe.

This is coming after the trending video on the failure of the bridge.

Adaramola Kuti, Federal Controller of Works in Lagos, who spoke on behalf of the government at a joint press conference addressed with the Special Adviser to Lagos State Governor on Works and Infrastructure, Aramide Adeyoye and the state Commissioner for Transportation, Dr. Fredrick Oladeinde, dismissed the video as old and urged Lagosians to ignore it.

According to him, the Federal Government has no plan to shut down the Third Mainland Bridge for rehabilitation before the end of this year.

“We want to assure Lagosians that the Third Mainland Bridge is free, it is safe and we are not unmindful of the pains that Lagosians are currently going through with the rehabilitation work going on Lagos/Ibadan Expressway Way and Lagos/ Badagry Expressway.

 

READ ALSO:

Hate Speech Bill: Senate Urges Nigerians To Be Patient, May Abandon Proposal

 

“So, there is no way we will close the Third Mainland Bridge at this critical period,” he said.

Speaking on the Lagos/Ibadan Expressway road, the Federal Controller of Works said that the construction work on the Kara to Berger portion of the road would be completed and the entire bridge would be reopened to traffic on December 15 this year, regretting that heavy downpours this year slowed down the pace of work on the ever-busy expressway.

“Though the rains did not allow us to work at a planned speed, but once we finish the construction work inbound Lagos from Kara, we will not close the other end of the road as planned before. We will open both sides of the road by December 15 this year so that people can enjoy free flow of traffic, especially during the Yuletide. We will resume work on the other side in January,” he said.

Kuti also assured Lagosians of the speedy completion of the rehabilitation work on the failed portions of both sides of Eko Bridge, stressing that the rehabilitation work on the bridge will end in December 14, 2019 with minimal effect on traffic as work has started at the Apongbon end.

Meanwhile, the state Commissioner for Transportation, Dr. Fredrick Oladeinde, who urged road users to obey traffic rules, said that officials of the Lagos State Traffic Management Authority (LASTMA), special task force and other security agencies have been mobilised to enforce the law.